服务项目Service Items
高新技术企业认定
ISO认证
政府资助
知识产权贯标
产品认证
资质代办
验厂辅导
TESCO factory audit
TESCO Factory inspection documents and contents:
I. Definition of TESCO factory inspection documents
Factory inspection documents refer to some basic documents and production records of the factory provided by the factory to the auditors during the factory inspection (including: Business license, employee manual, fire drill records, etc.), factory inspection documents are mainly in human rights, environment, safety, health and anti-terrorism and on-site documents, according to the requirements of the factory customer may have a different focus, some focus on human rights, some focus on safety, this depends on the factory customer is which one. Professional factory inspection documents are the escort messenger to ensure that the company successfully passes the factory inspection. According to your own experience, please refer to the following list of factory inspection documents (with some questionnaires).
2. TESCO factory inspection document list
Document data
1. Quality manual and management meeting minutes
2, inspection procedures, inspection standards and the latest 3 months of inspection report.(incoming materials, process, packaging, finished products)
3. List of main machines and equipment (please prepare one copy each in Chinese and English)
4. Machine and equipment maintenance plan and record
5. Professional certificate of machine maintenance personnel
6. Product specifications
7. Incoming and issuing records of raw materials
8. Staff training plan and training records
9. Pre-production meeting procedures and records and quality meeting records
10. Supplier management procedures, records, purchase orders and material specifications
11. Laboratory operation manual and test report
12. Defect statistics report and shipping record
13. Factory organization chart (please prepare a copy)
14, factory business license (please prepare a copy)
15. Current quality level record
16. Statistical records of timely delivery rate
17, ISO certificate and the latest review report (if any, please prepare an original and a copy)
18. Record of corrective and preventive measures
Field arrangement
1. Safe channel line
2, safety exit, emergency light, fire alarm bell
3. Chemical placement
4, warehouse special points
5, drinking water division
6. Establishment and procedure documents of suggestion box
Third, TESCO factory inspection anti-terrorism focus
C-TPAT Certificate
Security system
Container loading operation procedure
Container inspection procedures and records
Cabinet sealing record
Seal management program
General procedure method for TESCO Factory audit:
1. The first meeting of TESCO Factory inspection
① Introduce the purpose, method, time arrangement and division of work of the audit.
② Provide a list of documents and information to be reviewed
③ Explain the methods and requirements of worker interviews
④ Answer questions raised by factory representatives
2. TESCO inspection factory visit
① Understand the basic situation of the factory, plant, number of people, dormitory, etc
Be familiar with the route and understand the key points
3. TESCO factory inspection documents and records inspection
(1) Various documents required (such as provisions prohibiting child Labour, provisions prohibiting discrimination, etc.)
② Check the records of the 12 months, the last 3 months must meet the requirements of ICTI
4. TESCO factory inspection site inspection
① Including production workshop, warehouse, dormitory canteen, toilet, doorman, medical room, etc.
② Focus on the three principles of ICTI
③ Understand the production situation and record workers' activities on site
④ Take pictures if necessary
5. Interview with TESCO factory inspection workers
① Random selection
② Suspicious age
③ Factory representatives are not allowed to participate and will be held in a separate room
④ It may be one to one or a group of one to one
6. Last meeting of TESCO Factory inspection
① Issue interim report to decide whether to recommend
②10 days to issue a formal report
③ Thanks for the cooperation of the factory
④ Answer the questions raised by the factory
(It is possible to do 3, 4, and 5 at the same time.)
TESCO factory inspection Tesco factory inspection common inconsistencies:
one Poor hygiene
2. Poor safety condition
3. Environmental protection is not up to standard
4. Chemical unsafe
5. No head of security
6. No first aid training or fire drills
Seven. PPE is not provided and used
8. No MSDS
9. Work overtime
10. Wages are below the minimum wage
11. Illegal child labor
twelve Illegal use of adult workers
13. Collect deposits, seize identity cards or restrict personal freedom
fourteen Body searches, corporal punishment, violations of workers' rights
Fifteen. Arrears of wages
16. There are no statutory benefits
17. "Three-in-one" plant, machinery and equipment without safety devices
18. The dormitories are crowded and the accommodation conditions are poor.
19. Not inspected by the local health department and issued a certificate
20. Toilets and bathing facilities are inadequate
Twenty-one. Limited access
Twenty-two. Genderless segregation
Twenty-three. Ventilation is inadequate
24. The quantity and distribution of fire extinguishers and fire hydrants are unreasonable
Twenty-five. Unsafe factor
For more information about TESCO factory inspection, you can consult Tenglian consultant online. Shenzhen Tenglian Enterprise Management Consulting Co., LTD., established in 2005, is an old institution with independent legal personality in Guangdong Province. Specializing in ISO system certification, product certification, factory inspection counseling, high-tech enterprise identification, intellectual property implementation standards, government subsidy application, license agency and other qualification agents. Authoritative organization, experienced, full coaching. Senior certification counseling team, 15 years of experience, with exclusive approval channels, the pass rate is guaranteed! Since its establishment 15 years ago, it has served more than 7,000 enterprises and public institutions and government organizations.
Consulting telephone: 0755-27787866 13828761196 Mr. Chen
0755-27753399/19925332787 Miss Chen wechat consultation: tliso168